Getting Started

PARS User Reference
Attached is an extensive guide developed to assist users with all aspects of the system. Some elements may have changed with the release of the new PARS sys...
Sun, 14 Nov, 2021 at 8:18 PM
Comprehensive Contractor Project Performance (CPP) Upload Requirements
Please see the following link for the latest PARS CPP Upload Requirements information: https://www.energy.gov/sites/default/files/2024-04/PARS%20CPP%20Uplo...
Wed, 8 May, 2024 at 11:34 AM
PARS Extractor V2.0.35 Installation Instructions
The latest version of the PARS Extractor can be found at https://github.com/PARS-DOE/extractor-public/releases.. The attached guide provides instruction...
Sun, 14 Nov, 2021 at 8:22 PM
PARS User Training
PARS User training sessions can be found on Learning Nucleus by searching for PARS: There are two course hosted on the DOE Learning Nucleus Site for all...
Tue, 8 Feb, 2022 at 1:13 PM
Empower Useful Commands and Parameters
The attached document includes information on useful Empower Commands and Filter Parameters.
Sun, 14 Nov, 2021 at 8:51 PM
PARS Training Document - CPP Upload Process
PARS CPP Upload Module Please download the attached document and follow the detailed instructions.  
Thu, 18 Nov, 2021 at 1:18 PM
DOE EVMS Gold Card
DOE EVMS Gold Card reference sheet
Thu, 20 Jan, 2022 at 2:21 PM
Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)
EPASOP Final 20200114
Thu, 20 Jan, 2022 at 2:26 PM
Empower Useful Commands and Filter Parameters
Useful Commands and Filter Parameters
Thu, 20 Jan, 2022 at 2:30 PM
Export IPMRs Reminder
When exporting IPMR report, the Export option should be set to the Lowest Level. 
Wed, 23 Feb, 2022 at 8:40 AM